Power plant construction: costs and financing

Large power plant construction cost are the backbone of the energy system, providing uninterrupted power supply to residential buildings, industrial consumers and infrastructure.

Despite its high social importance, large power plant construction should be profitable and attractive to investors.

This takes into account both the initial investment costs associated with the construction and the operating costs that the owners of the facility will incur over the years.

Any power plant, be it a wind farm, a hydroelectric power plant or a solar power plant, is a multifaceted and technically complex project that requires the use of customized engineering and financial solutions to ensure its viability. The type of power plant, the choice of technologies and equipment, the scale of the project, location and other factors have a significant impact on investment costs.

The cost of building a large power plant construction is a critical factor in this equation that influences the final decision of the stakeholders.

How much does it cost to construct large power plant of different types?

The type of power plant is the main factor influencing the cost of an investment project and determining its economic viability.

However, investors must evaluate not only the cost of construction, but also other costs that will accompany a particular project throughout its life cycle. Construction costs for a wind farm and a solar power plant are typically significantly higher compared to combined cycle thermal power plants, while operating costs due to fuel costs in the latter case are many times higher than in most renewable sources.

Technical constraints, projected demand, environmental requirements, fuel consumption, maintenance, equipment modernization and other factors should be considered when planning investments in energy facilities in the long term.

Most important, however, are capital expenditures, which include the cost of all phases, from the draft to connecting the power plant to the grid.

Access to energy infrastructure, labor costs, legal frameworks, environmental restrictions, bank policies and many other factors should be taken into account in order to predict the final figure as accurately as possible. But even this does not give confidence that the project participants will be able to avoid budget overruns and construction schedule delays.

For example, the recent pandemic and geopolitical crisis in Europe came as an unpleasant surprise for numerous companies around the world, increasing the cost of some projects and calling into question the viability of others. Adding volatile prices for materials and equipment to supply chain problems, we can get a rough idea of the risks that await any company in the early stages of the energy project.

Our customized financial models, project finance services and flexible refinancing solutions can reduce the cost of capital for your project and get you through a difficult period.

Comparison of available cost options

The cost of construction is not the only criterion taken into account when choosing from several energy alternatives.

To justify the economic efficiency of different options for power plants, the method of comparative efficiency is usually used.

For the economic comparison of options, the so-called integral economic effect is used, the maximum value of which determines the most effective of them. Auxiliary criteria for comparing alternative projects are the internal rate of return, the return on investment, the payback period, financial incentives, utilization ration and others.

The integral economic effect is defined as the difference between the result of activity and costs for a certain period. The result is the proceeds from the sold electric and thermal energy, while the annual costs include the costs of building and operating a power plant of a certain type.

All compared projects are brought to an equal energy effect. In this case, this is an equal annual supply of electricity throughout the entire period of operation or the analyzed period.

As a criterion for the effectiveness, experts suggest using the total costs or the average cost of electricity supplied.

For most power plants, when determining the costs for the entire period (including the construction stage and the estimated operating life), the following is taken into account:

• capital investments;
• fuel costs (if applicable);
• modernization, major and current repair costs;
• staff salaries and services of third-party specialists;
• equipment maintenance costs;
• emission charge (if applicable);
• the cost of buying or renting land;
• land tax and other taxes and fees;
• annual payments on loans and so on.

When planning a large power plant construction, participants must clearly understand the business needs, on the basis of which technical requirements are developed and the most suitable financial models are selected.

For example, the most expensive solar power plants cost up to 1.5-2 billion euros, and the final cost of such a facility may differ significantly from the expectations of investors at the initial stage. Given the scale of construction, mistakes can cost hundreds of millions.

Construction costs for solar power plants

Modern solar power generation is based on two technologies.

Firstly, it is simple and affordable photovoltaics, which directly converts solar energy into direct current.

Secondly, it is an indirect method of concentrating solar energy using reflectors to heat a thermal transfer medium such as molten salt or a thermal oil, which then drives a turbine and generates electricity even in the absence of solar radiation.

How much does a solar PV power plant cost?

The cost of building photovoltaic systems depends on many factors, with a clear trend towards decreasing cost per megawatt of installed capacity as the scale of an investment project increases.

How much does a 1 MW solar farm cost?

This question usually starts the discussion of photovoltaic investments.

The total cost of building a photovoltaic power plant ranges from 600 thousand to 1.2 million euros per MW, depending on the project and the components used.

The cost of building solar power plants is decreasing every year due to scientific progress, the political will of leading countries and economies of scale affecting the production of equipment. The EU and most of the developed countries of the world require an increase in the production of energy from renewable sources every year, so government policies will favor investors in building more photovoltaic systems.

The emergence of more efficient photovoltaic cells and sustainable reduction in prices for photovoltaic equipment are leading to an ever faster return on investment.

In 2010, the average cost of building solar PV power plants in the world was about 4.8 million euros per megawatt of installed capacity. In 2022, this figure dropped to 800 thousand euros per MW, showing an impressive sixfold reduction in construction costs over the past 12 years.

When deciding to build a photovoltaic farm, in addition to buying inverters and panels, you need to consider land costs, construction, installation, connection, fencing and monitoring costs.

In terms of performance, an average 100 MW solar power plant located at the latitude of Northern Germany, for example, produces about 100 GWh of green energy annually.

According to studies, 1 MW of PV panels, including auxiliary equipment, require approximately 2.6-2.9 hectares of land.

Therefore, a solar power plant with an installed capacity of 50 MW will require at least 130 hectares of land, not counting administrative buildings and infrastructure. A long-term lease of land for building a solar power plant can cost from a few hundred euros to 1,000 euros or more per hectare of land annually, depending on the type of area.

It is important to take into account the costs that arise at all stages of an investment project, including the cost of operation and maintenance, the cost of financing, as well as the potential reduction in generation as a result of the natural decrease in the efficiency of photovoltaic modules.

Thanks to the rapid development of photovoltaic technology, the market offers durable PV panels, the productivity of which decreases linearly by about 15% after 25 years of operation.

The payback period of a modern photovoltaic farm reaches 8-10 years with a life cycle of about 25 years.

The cost of concentrated solar power plants (CSP)

An important advantage of such systems is the storage of energy in the form of a heated molten salt for long hours, which makes it possible to accumulate excess energy falling on reflective surfaces during daylight hours. This is very important for regions such as the Middle East and North Africa, where the intensity of solar radiation during the daytime is very high.

The largest operating power plants of this type, such as the Noor Complex Solar Power Plant (Morocco), are located in regions with the highest intensity of solar radiation, due to rational technical reasons.

Unlike photovoltaic systems, concentrated solar power plants have not shown a significant reduction in capital costs over the past decade. These are very expensive and technically complex projects based on the so-called Thermal Energy Storage technologies (TES), which are still quite capital intensive. In 2010-2011, industrial-scale CSP systems cost an average of 10 million euros per 1 MW of installed capacity, while in 2019-2020 this figure varied from 5 to 8 million euros.

Photovoltaic systems are much easier to build and install.

But like other solar power plants, CSP projects require huge land plots for the installation of reflectors, so the cost of buying / renting land plots is also high in this case.

It should also be remembered that the operation and maintenance of concentrated solar power plants is very expensive due to the use of chemical heat transfer fluids and special operating modes.

Moreover, some chemicals create certain environmental risks, which affects the cost of the project and its investment attractiveness.

Looking to the future, new research aims to transform excess carbon dioxide from atmospheric air with the help of light. In this context, CSP projects may become industrial CO2 harvesting plants over the next decades. This will start the global process of atmospheric decarbonization and open up a new source of income for the owners of next-generation concentrated solar power plants.

Construction costs for wind farms

There are many advantages of wind power, including environmental and economic ones.

The total kinetic energy of the wind in the world is estimated to be about 80 times higher than the total energy consumption of the world economy. Although only a certain percentage of this total can be used for energy needs, the future development of this technology has enormous potential.

Regardless of the type of project, building a large industrial scale wind farm is a significant investment that can require hundreds of millions of euros in the early stages. However, given the rising cost of electricity and significant advances in wind power generation, successful wind farms demonstrate payback periods of less than 10 years under favorable conditions.

For small wind power plants intended for autonomous generation, the payback period can be up to 12-15 years, depending on the type of equipment, wind speed, mode of use and other factors.

The average time required from the final investment decision to the construction of a wind farm is approximately 1 year for an onshore project and approximately 3 years for an offshore wind farm. This is largely determined by local legislation and regulatory procedures, which vary widely not only in different countries of the world, but even within the EU.

Onshore wind farms: When we talk about onshore wind projects, we mean a wide range of technological solutions of various sizes, designed both for autonomous generation and for power supply of entire cities and regions.

Economies of scale largely determine the cost of building onshore wind farm and large power plant construction

Experts estimate that the installation of a small wind turbine will cost approximately 4,500-5,000 euros per kilowatt of installed capacity. In contrast, large wind power plants cost on average €1.2 million per megawatt installed. The cost of building large wind farms is rapidly declining, primarily due to the introduction of ever more powerful wind turbines.

According to European experts, the cost of building wind farms has decreased by an average of 20-25% between 2015 and 2022, depending on the type of project and the technology used.

Spain has the lowest installed capacity cost per megawatt, while Germany and France show the highest cost of wind projects in Europe (the difference can be up to 35% for similar projects).

Despite technological advances, onshore wind energy experts expect an end to the further decline in the cost of wind farms in the near future.

This is due to factors such as inflation, rising global building material prices and natural size limits for onshore wind turbines.

Offshore wind farms: As far as offshore wind projects are concerned, they have always been more attractive to maritime countries due to the wide availability of suitable construction sites.

The sea shelf, which is not used economically, opens up unlimited opportunities for generating green energy. Another very important advantage of offshore wind turbines is the absence of strict requirements for maximum height, rotor diameter and noise level, which are serious obstacles for the development of onshore projects in densely populated areas, for example, in Europe.

The disadvantage of this technology is the relatively high cost of building offshore wind farms, which is 3-4 times higher than the cost of similar onshore projects. Huge offshore installations are difficult to transport, assemble and install both on the seabed and on floating platforms.

The initial costs associated with the development of such projects can be very high.

At the same time, rapid progress in this area allows energy companies to achieve competitive LCOE.

Over the past 12 years, the cost of an installed megawatt of offshore wind power globally has almost halved, from about 6 million euros to 3-3.5 million euros.

This progress is due to significant improvements in offshore wind power generation technology and the introduction of larger turbines reaching 16-18 MW. In particular, the latest offshore turbine Haizhuang H260-18MW from CSSC (China) was the largest in the world at the beginning of 2023.

One such unit with a 260-meter rotor diameter capable of generating about 74 GWh of electricity every year. The evolution of offshore wind turbines from standard 3-5 MW to 18 MW industrial monsters clearly demonstrates the impact of economies of scale on the cost of building and operating offshore wind farms.

Construction costs for thermal power plants

In 2023, the cost of building traditional thermal power plants will start from 600-800 thousand euros per 1 MW of installed capacity.

In most cases, energy companies have to deal with capital expenditures ranging from 1.2-1.5 million euros per megawatt and even more, depending on the chosen technology, facility location and other factors.

When choosing investment alternatives, the following types of thermal power should be considered:

• steam power plants;
• combined cycle power plants;
• gas turbine power plants.

Combined cycle thermal power plants have a high level of efficiency compared to other types of thermal power plants.

This means better performance in the long term. These power plants are usually built to meet baseline loads. However, the construction of power plants with two cycles of thermal energy requires additional costs, so CCPPs are considered to be much more expensive than traditional steam power plants. Another disadvantage is the long construction period.

The average cost of single shaft combined cycle thermal power plants without advanced emission minimization technologies is about 1-1.3 million euros per megawatt.

When it comes to installing carbon capture and sequestration equipment, the cost of the project could skyrocket to 2.5-2.8 million euros per megawatt of installed capacity.

Following the path of increasing efficiency, some companies are now focusing on building advanced ultra-supercritical coal-fired power plants (AUSC). These power plants with special technologies for burning finely dispersed coal produce steam at a temperature of 700-750 C, reaching net efficiency rates of 49-50%.

These impressive figures require the use of expensive equipment and heat-resistant materials, which increases the cost of building typical AUSC power plants to 3 million euros per megawatt of installed capacity.

The introduction of carbon capture and sequestration (CCS) technologies increases the cost of such power plants to 5-6 million euros per megawatt.

Equipment, building materials (eg steel and aluminium) and labor are important factors influencing the final cost of thermal power plants.

Most projects of this type take at least 3-5 years, so fluctuations in variable costs are important to consider when planning investment projects and large power plant construction.

Construction costs for hydropower plants

In 2022, the average cost of building hydroelectric power plants and large power plant construction in the world was about 1.9 million euros per megawatt of installed capacity.

There are no signs of price declines in this segment as the hydropower sector relies heavily on available land and civil works costs rather than on changing technologies. Today it is one of the most expensive power generation technologies in the world.

Moreover, the rising cost of labor and building materials are making this type of power plant increasingly expensive for investors.

For example, between 2010 and 2022, the average cost of hydroelectric power plants increased by 30-50%, depending on the region and project type.

Despite high construction costs, hydropower plants remain the backbone of low-carbon power generation. These facilities do not require significant operating and maintenance costs, which makes the generated electricity affordable and competitive.

In addition to large powerful hydroelectric power plants, which have been actively built in East Asia in recent years, business is interested in mini-hydroepower plants.

These are small facilities with an installed capacity of no more than 10-30 MW (classification depends on the country), capable of providing cheap electricity to plants, factories and remote settlements that do not have access to the power grid.

The cost of such power plants per megawatt will be higher compared to large projects, but the potential for local power generation is huge, especially in countries with numerous small rivers (eg UK, Canada, Brazil, Poland, Romania and others).

Construction costs for geothermal power plants

Geothermal facilities are characterized by a wide variety of technologies used, which explains the differences in project costs of large power plant construction.

Much depends on the type of project, location, depth and temperature of the geothermal source and a number of other factors. On average, the cost of geothermal power plants in 2023 varies from 3 to 5 million euros per megawatt.

Dry steam, binary cycle or other engineering decisions largely determine the financial aspects of a particular project. Obviously, the direct use of hot water available close to the ground requires a much lower investment compared to drilling deep wells. Moreover, exploration work in the early stages of a project may require millions of euros of investment, and these funds must be raised by the owners in an environment of economic uncertainty and risk.

Unlike large power plant construction as solar or wind energy, geothermal projects have not fallen in price over the past decade.

Investment costs of large power plant construction are affected by the high cost of drilling equipment, as well as the rising cost of labor and building materials, which account for a large share of the total cost of such projects.

According to Fitch Solution, construction costs for geothermal power plants have increased from 2.6 million euros per megawatt in 2010 to 4.4 million euros per megawatt in 2020. Due to technical constraints and high capital costs, the levelized cost of electricity generated from geothermal sources, also remains relatively high, which hinders the further development of this sector.

Not surprisingly, geothermal power plants remain the second choice for a limited number of countries with favorable geological conditions.

These include the United States, the Philippines, Indonesia, Mexico, Turkey, Japan, Italy, New Zealand and a number of other countries that are developing geothermal power generation despite the difficulties.

If you are interested in financing a major energy project, please contact the CP Finance UK FINANCE LIMITED for details.

We offer long-term loans starting from 50 million euros, and we also develop customized project finance solutions for the construction of large power plants, electrical substations and other energy infrastructure.

CP Finance UK FINANCE LIMITED
Website:https://c-pfinanceuk.com/
E-mail:finance@cpuk-financeltd.com
Alt-Email:admin@cpukfinanceltd.com

Read More

Hydropower plant projects: Financing and loan

Since the 1970s, there has been an increase in the number of projects implemented worldwide especially in  financing Hydropower plant projects using  financial instrument, (Project Finance) especially in the infrastructure and energy sector.

Although PF is not a fundamentally new form of financing, its importance for the world economy is steadily increasing. Optimal risk allocation and off-balance sheet investments are very important for investors.

Traditional secured long-term bank loans do not provide these benefits.

CP Finance UK is ready to offer financing for hydropower plant projects on attractive terms and affordable rates anywhere in the world.

We offer flexible contracts, guarantees, long-term debt repayment and professional support to clients when setting up an SPV and attracting investments.

Contact us to find out more.

Investment opportunity in financing hydropower projects

In recent decades, there has been a perception among international investors that financing hydropower is too difficult and risky. Especially when it comes to the implementation of large projects in developing countries with strong corruption, an imperfect legislative framework and an unstable political situation.

Financing of hydropower projects requires huge investments, the cost of which depends on the specific project, location, technology used and rules in the host country.

The leading trend in the modern economy is the gradual energy transition from fossil fuels to renewable energy sources.

While hydropower continues to be controversial among environmentalists, this renewable energy source is growing steadily.

The construction of a hydroelectric power station has an ambiguous impact on the life of the local population. On the one hand, it is a source of cheap electricity and jobs (especially during the construction period). On the other hand, the flooding of thousands of square kilometers of agricultural land and forests for reservoirs transforms the human habitat, and sometimes even requires the resettlement of a number of villages and towns.

The construction of other energy projects, such as thermal power plants, solar power plants and even wind farms, looks more predictable from an investment point of view. Here, the investor is faced with fewer uncertainties, initially clearly understanding the real cost of construction and having a vision of future benefits.

Meanwhile, the benefits of hydropower are not limited to renewable energy generation.

In other words, a commercial bank is not always ready to allocate sufficient funds for the implementation of an investment project.

This requires non-standard approaches to financing the construction of hydropower plants, including project finance instruments (PF) and public-private partnership (PPP).

Concessions for the construction of hydroelectric power plants

An important element of cooperation between the state and companies that initiate energy projects is payment for the natural resources. Different countries use different approaches to calculating these payments, to which taxes, license fees, concession fees and other costs are added.

Expanding private capital participation begins with concession agreements for the construction of hydropower plants, which allow local and foreign companies to build, upgrade, expand and operate these facilities, generating a stable income from the use of natural resources. The terms of the concession differ significantly depending on the country that implements the project. In some schemes, such as the BOO contract, a private investor becomes the owner of the facility under construction.

The discussed PPP schemes leverage the initiative, economic potential and expertise of the private sector to improve services and accelerate the implementation of capital-intensive strategic hydropower projects.

By working to improve the quality and accessibility standards of each project, public-private partnerships contribute to the development and economic and social growth of the host country.

Brief description of the most famous hydropower project delivery methods:

• BOOT (build, own, operate and transfer). In BOOT projects, hydropower plants are entirely built and operated by a private company. 

• BOT (build, operate and transfer). This contract specifies that a special purpose vehicle (SPV) must build, operate, and then transfer the assets or all components of the project to the government. 

• BOOT (build, own, operate and transfer). In BOOT projects, hydropower plants are entirely built and operated by a private company.

By working to improve the quality and accessibility standards of each project, public-private partnerships contribute to the development and economic and social growth of the host country.

The role of project finance in the construction of hydroelectric power plants

Financial experts offer different definitions of PF, although there is no consensus in the scientific literature on the role of certain characteristics as distinguishing features of PF.

Project finance (PF) is an approach widely used in large energy and infrastructure projects.

Some of the key features of project finance include

• Sponsors and holders of SPV shares, among other things, may take an active part in the implementation of an investment project, for example, as contractors or subcontractors.

• A special purpose vehicle implementing an investment project uses high financial leverage, while lenders have limited opportunities to make financial claims to sponsors in the event of a project failure.

• Project participants such as contractors, managers, lenders, suppliers, electricity users, and often government agencies create a system of contractual relations aimed at identifying and managing risks based on the competencies.

It looks like a daunting task that requires professional planning and supervision. Since the debt maturity can be delayed for 15 years or even more, the use of PF instruments is always associated with numerous internal and external risks, such as the risk of bankruptcy, the risk of changes in the demand and cost of electricity, currency fluctuations, etc.

CP Finance UK offers financing for large energy projects around the world.

We are ready to provide comprehensive professional assistance to your business for the construction of hydropower plants in Europe, USA, Latin America, East Asia, Africa and the Middle East.

Alternative ways to finance hydropower projects

Financing hydropower plant projects, including the construction of hydropower plants, is usually carried out through combined schemes and instruments with the participation of several sources (investment funds, banks, large private investors).

Nevertheless, the financing structure should be selected individually, based on the specifics of a particular project and the conditions for its implementation in a particular country.

Project finance (PF) in its various forms is considered the most appropriate for such investments.

In the context of the differences between public and private financing, it should be noted that most large hydropower projects are financed simultaneously from several sources. On the one hand, private lenders can provide significant funds with a high interest rate against the collateral of the borrower’s assets or the future cash flows of the project.

On the other hand, the state can finance the construction of hydroelectric power plants on more favorable terms, but in order to receive such financing, an investment project must meet a number of strict conditions.

Equity financing: Equity financing, in essence, is raising capital in exchange for a certain part of a company or project by issuing shares.

Unlike traditional lending, business gives creditors the right to participate in the company’s activities and receive dividends. Consequently, this method of financing entails a decrease in the borrower’s share in the business.

Equity financing of hydropower projects involves the transfer of a certain share of the business and future cash flows to the lender. Moreover, this may entail a loss of control over the project, which is unacceptable for energy companies or large energy consumers in the context of a long-term development strategy.

Debt financing provides existing owners with the capital they need while maintaining full ownership and control of the business.

Debt financing for the construction of hydropower plants includes long-term loans from commercial banks, mezzanine financing, bond issues, grant financing and other instruments. Unlike equity financing, lenders do not have the right to manage the business and make strategic decisions, nor do they share risks and dividends.

In addition to the obvious benefits for business and society, the construction of hydropower plants under public-private partnerships is associated with some risks. In particular, government intervention in a project is sometimes accompanied by corrupt practices, various unplanned delays and funding cuts, and a decrease in overall efficiency. On the other hand, private investors are mainly interested in the commercial component of the project, so the state must monitor compliance with social obligations, environmental standards and other non-commercial aspects of the project.

Unfortunately, the world’s poorest countries do not have sufficient resources and experience to implement large energy projects through public-private partnerships.

In these cases, the role of international organizations increases, which help governments in the development of the industry and provide the necessary funding for strategic projects.

If you are planning to build a large hydroelectric power plant, please contact our representatives.

CP Finance UK offers financing for hydropower plant projects and other services.

Thanks to close cooperation with leading equipment suppliers and engineering companies, we are also ready to act as your general contractor for the construction of energy facilities under the EPC contract.

Email:finance@cpuk-financeltd.com
Website:https://c-pfinanceuk.com/

 

Read More