Model for financing a thermal power plant

Funding for thermal power plants projects is declining every year, but the use of fossil fuel energy remains a bridge linking the modern economy with an innovative carbon-free model of the future.

The growth of renewable energy sources in recent decades heralds an imminent green transformation of the global energy sector.

Against this background, investment projects in the field of coal energy over the past decade have decreased by almost 5 times, retaining, however, a dominant role only in the PRC and developing countries of Asia.

According to the Sustainable Finance Program (Oxford University), the cost of borrowed funds for the construction of new thermal power plants in the world is growing, while the development of renewable energy projects is rapidly becoming cheaper.

Funding for thermal power plants projects is becoming more expensive, reflecting the potential risks associated with changes in legislation.

Despite gloomy forecasts, the construction of combined cycle thermal power plants, including gas-fired power plants and innovative integrated gasification combined cycle technology, continues to play an important role in the energy strategy of the United States, China, Russia, India and other countries.

Considering the huge reserves of coal, oil and gas, which will be enough for the energy industry for at least half a century, the energy of fossil fuels continues to be used even in the context of the global energy transition.

Under the new conditions, companies planning to implement fossil fuel energy projects should prioritize the choice of a financial model for a thermal power plant project.

The correct choice of funding sources becomes the key to the viability of such projects in the future.

Bank loan, combined project finance instruments or bond issue?

It is critical to choose the right financial model for a thermal power plant project, the success of which depends on the asset value of the initiators, future cash flows, electricity and fuel prices, demand forecast and other factors. A deep understanding of the market will help you find the most adequate funding for your project.

Securing funding for thermal power plants projects on the world market requires practical experience and cannot be successfully carried out without the qualified assistance of financial consultants. Assuming that the thermal power plant project already has a viable financial model, the next step should be to use the services of one or two international banks with sufficient experience in financing energy projects.

CP Finance UK Finance brings together an international team of professionals providing comprehensive services for medium and large businesses.

We offer project finance services, develop advanced financial models and advise clients on any financial, legal and engineering issues.

Are you looking for a reliable partner for your energy project?

We are ready to act as your general contractor, offering the construction of thermal power plants under an EPC contract.

Contact us anytime with your project details.

Choosing a financing model for a thermal power plants project

When structuring project financing, the lender must adapt the construction contract or EPC contract accordingly.

It must be drafted in such a way that the rights of the initiator in relation to the specified contract can be transferred in favor of the creditors.

A professional analysis of the contract as part of the structuring of the financial model for a thermal power plant is crucial mainly due to the following fundamental aspects:

• The lender or investor must have access to any economic benefit that the issuing company receives under the contract. In case of violation of the terms of the contract, these funds can be used to compensate for losses to the party financing the construction of the thermal power plant.

• The proponent of the project has limited financial obligations to the contractor, which are clearly defined by the contract in such a way as to avoid “overestimating” the project. To minimize risk, it is important to enter into contracts on a “one-time payment” basis.

It is clear that the more predictable the project budget is and the more limited the risk of its increase during the construction phase of the facility, the lower the risk for the investor.

The financial model for a thermal power plant project should be designed in such a way that the parties have the maximum interest in the successful completion of this project. It is obvious that the investor sets the following conditions.

First, the funded project must be completed on time and put into operation on schedule.

Secondly, the investor is interested in not having a significant cost overrun during the construction phase.

If the proponent of the project does not guarantee that the aforementioned points are properly provided for in the construction contract, then there is a risk that potential investors will refuse to participate in the project. If the project is financed through the stock markets, the success of the bond placement cannot be guaranteed under these circumstances.

For these reasons, the participation of professional financial consultants is essential for the correct organization of financing for the construction of a thermal power plant and ensuring acceptable conditions for the implementation of the project, whether it is a new or mature project.

Bank lending for the construction of thermal energy

The successful launch and expansion of any business initiative, including the implementation of large energy projects, requires available sources of financial resources.

Bank loans are a very popular source of capital for acquiring assets, financing operating expenses, and fulfilling contractual obligations to suppliers, contractors, customers and other lenders.

Despite the wide range of available funding sources, the issue of financial provision of the project with bank capital comes to the fore. Funding for thermal power plants projects on bank lending compares favorably with its simplicity compared to alternative financial models.

Despite the rapid development of equity markets, banks are much more important sources of financing for the energy sector.

Investment loans in some regions of the world account for more than half of all capital-intensive energy projects implemented.

Investment loans: An investment loan is a long-term loan provided by a bank or other financial institution to finance investment expenses related to running and developing a business, including the construction of large facilities.

This loan is used to finance investment projects related to the modernization, reconstruction or expansion of the company’s fixed assets.

The funds raised are used to purchase a land plot for construction, build new power units or expand existing facilities, purchase generators, boilers, turbines, conveyors and other equipment.

The loan amount is allocated to the borrowing company in accordance with the individual needs of the project. A loan can be obtained once or, for example, in parts adapted to the schedule of the investment project.

Funding for thermal power plants projects and construction cost of the facilities ranging from $ 600 to $ 1,000 per megawatt, the total project cost can reach several hundred million dollars.

This makes the development of a financial model critical to the success of the project.

The condition for obtaining an investment loan for the construction of a thermal power plant is confirmation of the economic efficiency of this project, as well as the issuance of loan collateral or other reliable guarantees, well-prepared technical documentation and financial plans.

To reduce credit risk, banks often require the borrower to participate in the planned investment project.

Depending on the type of project, the contribution ranges from 10% to 20% of the investment value.

This requirement is based on the assumption that a borrower risking equity capital will be more interested in the success of his investment.

Bank financing or bond issue: important considerations

Choosing a financing model for any capital intensive project is often a dilemma.

Bank loan, project finance or bond issue?

There are many financial and legal reasons in the thermal energy sector that are important to assess in each case.

If the analysis of the financial model and funding for the thermal power plant project showed that it is necessary to take a long-term loan (15 or 20 years), then the international capital market may be a more appropriate solution compared to the traditional bank loan.

With rare exceptions (for example, long-term loans from the International Finance Corporation), the syndicated loan market offers shorter maturities than may be required to finance a TPP project.

On the other hand, bond financing tends to have fairly long maturities with easy setup and restructuring.

For this reason, the financing of the thermal power plant project can be carried out through the issue of bonds. Given the complex nature of the issue, companies need the right financial instruments and professional support to successfully place bonds, especially among international investors.

Bank loans in many cases are simpler and more affordable compared to entering the stock markets or organizing project financing.

However, there are several good reasons to finance a TPP project through international bond markets:

• The company needs large investments, but banks and the local stock market do not have sufficient appetite to finance the project.

• Companies, for certain reasons, are not satisfied with the financing conditions offered by local banks, credit institutions or private investors.

• The project initiator seeks to diversify risk by opening up access to international institutional investors from other parts of the world.

• Placing bonds on the international market makes the TPP project more competitive given the high rates on bank loans and the complexity of organizing project financing.

The choice largely depends on the scale of the project, the supply of fuel (natural gas, coal, fuel oil or possibly biomass), guaranteed demand for electricity, and the availability of strong sponsors with extensive experience in the sector.

It is important to understand that it is more difficult for companies from developing countries to take advantage of certain financial instruments, such as placing bonds on the global market.

The flexibility ofD is considered to be an advantage over bond-based financial models due to the broad opportunities for negotiating with the bank on changing debt repayment schedules, as well as restructuring and refinancing loans.

On the one hand, serious energy projects are carefully planned and studied, including a detailed risk assessment.

On the other hand, the construction of thermal power plants in developing countries carries serious risks that may require a revision of the financing conditions at any time.

This is not easy to do in the case of the issuance of project bonds.

The project initiator must also anticipate future legislative changes, which are rapidly moving towards green energy in many countries. Obtaining government guarantees can secure the project and will help to increase its investment attractiveness.

Project bonds: a new word in energy financing

Recently, project bonds have been actively used to finance capital-intensive projects.

This can be explained by a number of advantageous features of this type of securities that distinguish them from traditional corporate bonds. Borrowed funds raised by placing project bonds are paid from the cash flow generated by the project, but not from the issuer’s current income.

This feature makes project bonds a kind of long-term investment in future projects. Today, project bonds have become very attractive to large financial players looking for stable and long-term investment opportunities.

Such securities are readily purchased by pension funds, large investment funds, as well as insurance companies and other institutional investors.

The concept of project bonds is underdeveloped in some regions of the world, but this method is gradually crowding out traditional debt financing, especially in capital-intensive sectors such as energy, infrastructure and the LNG industry.

An innovative financial model of a thermal power plant project based on the placement of project bonds has a number of advantages for the initiator.

However, some aspects continue to cause debate among entrepreneurs.

The first argument against the use of project bonds to finance large objects is the so-called negative carry.

Its essence lies in the fact that the issuing company receives funds immediately, while the costs of building a power plant are spread over a period of several years.

This leads to a situation where the issuer is forced to regularly pay interest on borrowed funds that are not actually used at a given time. To avoid unnecessary costs, companies should use a special mechanism of deferred payments or issue several series of bonds in accordance with the financial needs of the project.

The second argument in favor of debt financing for the TPP project is limited access to stock markets.

Some companies will not be able to effectively place their bonds on the international market, while the local market is underdeveloped and does not meet the needs of the business.

This problem is especially common in young companies. But on the other hand, such companies rarely undertake the implementation of large energy projects. In addition, small companies with limited assets do not have access to bank loans, turning to project finance instruments.

Despite a number of controversial issues, project bonds are widely used for funding for thermal power plants projects and construction of the facilities and other large energy projects.

Since such projects are characterized by very high and stable incomes, which are guaranteed by long-term agreements, investors’ appetite for purchasing project bonds is high today.

Project finance (PF) for thermal power plants

The term “project finance” means funding a thermal power plants from internal financial resources and (or) borrowed funds provided against future cash flows, but not against the assets of the company that initiated the project.

Thus, the potential return on investment and risks largely depend on an accurate and reasonable assessment of a particular project by the investor.

Project finance (PF) is widely used in the energy sector due to the attraction of large investments on an off-balance sheet basis.

Thanks to the competent implementation of this financial model for the TPP project, companies can simultaneously build several large facilities without burdening their financial statements with a huge debt.

In most cases, partners create a dedicated project company, whose assets serve as collateral and its future cash flows are used to service debt.

Banks in this case provide about 70-80% of the project cost, but some financial institutions offer to finance 90% of the project and even the full cost.

The complex structure of the contractual relationship in the framework of project finance contributes to the optimal distribution of project risks between the parties who can best cope with these risks. Consequently, the organization of the PF, along with a detailed analysis of the project, requires multi-stage negotiations and time-consuming legal work.

Regardless of the project type and funding method, partners will make a decision to participate based on implementation risks and expected income.

The financing structure, collateral and other points depend on the specific case.

The cost of arranging project finance (fixed costs) is considered to be higher than traditional debt finance models of a thermal power plant project. In this regard, the PF can be used only for the implementation of large investment projects, estimated at tens of millions of euros.

Most often, project finance is used for the construction of large-scale facilities that require expensive R&D, engineering, as well as technically complex construction and the purchase of expensive equipment.

Until recently, project finance was considered quite risky, but in the mid-2000s, a number of economic studies appeared that confirm the significant advantages of PF instruments over traditional corporate lending in a number of investment projects.

This financing method has been used for the construction of numerous thermal power plants, substations and power lines in the United States, Latin America, Africa, Europe, as well as in East Asia, the Middle East and other regions of the world.

CP Finance UK Finance is ready to offer long-term bank funding for thermal power plants projects on attractive terms.

We also arrange project finance for the construction of thermal power plants around the world, providing a full range of financial, legal and engineering services for energy companies.

Advantages of project finance

Project finance is chosen by energy companies due to several principal advantages, listed below:

• Non-recourse or limited recourse financing.
• Off-balance sheet financing of the project.
• High share of borrowed funds in the project, reaching 90%.
• Absence of strict restrictions in the contract.
• Isolated financing, where SPV acts as a borrower.
• Potential tax benefits.
• Minimization of risks.

To better understand the advantages of project funding of thermal power plants, below we describe in more detail about each of these aspects.

Any combination of the above aspects is sufficient for sponsors to consider the project finance method as optimal for project implementation.

But the most important benefits of the PF for the initiator include limited recourse and off-balance sheet financing through the creation of an independent project company.

If you are interested in project finance for thermal power plants, contact the CP Finance UK Finance financial team. Together with our European partners, we have implemented numerous energy projects in more than 30 countries around the world, so we are ready to use our experience and business contacts to promote your business.

Our services in financing the construction of thermal power plants

CP Finance UK Finance, an international financial company, has served private companies and government customers for over a quarter of a century.

We provide loans, project financing in the energy sector, provide loan guarantees, as well as offer investment engineering services, financial model development and consulting.

The geography of CP Finance UK Finance services covers almost the whole world: USA, China, Mexico, France, Germany, Spain, UAE, Argentina, Brazil, Venezuela, South Africa and other countries. Extensive international experience and deep understanding of the energy sector guarantee the high performance of our solutions.

Our team with partners carries out engineering design, construction and modernization of coal and gas thermal power plants of various types.

CP Finance UK Finance offers advanced integrated solutions for industrial customers.

If you are looking for a reliable financial partner or general contractor, please contact us.

CP Finance UK FINANCE LIMITED
Website:https://c-pfinanceuk.com/
E-mail:finance@cpuk-financeltd.com
Alt-Email:admin@cpukfinanceltd.com

Read More

Real estate project finance: funding options and general features

Over the past few decades, developed countries have used a new method of financing of real estate projects and risky development projects 

This method is called project finance (PF).

This concept is usually characterized as leveraged financing of a project with limited recourse by raising funds through a specially created independent company.

Thus, project finance differs from traditional construction finance in at least two ways.

First, lenders share some of the business risks with the project company.

Secondly, the project finance is provided against the future cash flow generated by the project.

A very important feature of the projects implemented in this way is the sharing the risk between the participants. Each PF initiative is assessed by the participants mainly in accordance with its ability to generate cash flows, which become the main guarantee of debt repayment and return on equity.

Project finance is a flexible combination of financial products / services that makes it possible to finance projects in the field of residential or commercial construction against a guarantee of expected future cash flows.

In order to obtain a safe environment for invested funds, the generated cash flows must be isolated from any other property of the participants.

This is achieved through the establishment of a special purpose vehicle (SPV / SPE). Thanks to a formally independent company, in the event of a project failure, creditors can only seek to satisfy their claims within the assets of the project company. Accordingly, the initiators risk only those funds that were invested in this company.

Conversely, in the event of shareholder insolvency, the SPV / SPE will continue to operate under all circumstances.

This guarantees the completion of the development project regardless of the financial health of the initiating companies.

Real estate project finance

Currently, there is a wide range of instruments for financing of real estate projects of various types.

Usually, developers use financing from internal sources and attract external financial resources by issuing shares or borrowing (loans, leasing, bonds).

The world financial literature gives more than fifty methods of real estate financing, classified according to many criteria.

The dilemma of every developer at the stage of preparing to secure financing of real estate projects is the choice of the most appropriate source of funds and the organizational form of the project.

CP Finance UK has recruited a multidisciplinary finance team with solid experience in financing development projects around the world.

We are ready to offer a large bank loan of 10 million euros or more with a maturity of up to 20 years for a Financing of real estate projects.

If you are looking for a reliable source of funds for the construction of large properties or refinancing loans, contact us.

Financial engineering in project finance

All residential and commercial real estate projects are characterized by a complex planning stage and a long period of operation of finished objects.

Another important characteristic of such projects is the irreversibility of investments.

At the initial stage, the project involves high capital costs, and at a later stage, the maintenance of buildings and residential complexes implies significantly lower operating costs. The revenues / benefits from such a project increase over time, but the costs are stable and predictable.

The implementation of a large development project usually involves a significant proportion of borrowed funds (high debt burden). Moreover, the bulk of the required resources must be provided within the first 1-2 years of construction.

Financial engineering in real estate project finance applies to the selection of funding sources and capital structure.

It assumes, in particular, the following actions:

• Calculation of the weighted average cost of capital (WACC).
• Determination of the optimal capital structure and external financing mechanisms.
• Assessment of the project’s creditworthiness and search for optimal sources of funds.
• Financial planning of cash flows after tax.
• Securitization of future financial flows.
• Identification and assessment of project risks.
• Preparation of a hedging strategy to reduce / eliminate risks using derivatives.
• Refinancing of asset-backed securities.

The preparation and implementation of a large development project depends on the impact of other sectors, therefore it is extremely vulnerable to changes in the macroeconomic situation, legislative changes, and so on.

This is clearly demonstrated by projects for the construction of hotels, shopping centers or entertainment complexes, which have suffered as a result of the pandemic and severe restrictive measures.

For this reason, financing of real estate projects requires a professional approach to project risk assessment.

PF assumes a rational distribution of risks between participants, depending on their ability to control these risks.

Financing of real estate projects looks complex, requiring a combination of various financial instruments, including complex derivatives.

It is very difficult, therefore projects according to this formula in many developing countries of the world with a weak financial market are not being implemented.

When modeling financial cash flows, classical discounting methods are used. The finance team needs to calculate whether a given project has a positive or negative value, or calculate the rate of return. Of course, a detailed analysis of the financial projections is necessary.

If you need real estate project finance services, please contact CP Finance UK.

Bank loans for commercial real estate projects

Currently, bank financing of real estate is most often carried out according to the project finance formula (PF).

Moreover, the use of a long-term bank loan is becoming an integral part of the process of buying / building commercial real estate in modern realities.

In the project finance formula, the borrower considers the proceeds from the project as the main source of debt repayment. This type of financing is entirely based on the future cash flows expected to be received under commercial lease contracts, both already signed and ready to sign.

In the case of a PF, the borrower is usually an independent special purpose vehicle (SPV or SPE – Special Purpose Vehicle / Special Purpose Entity), which deals only with the construction and management of real estate.

Thanks to this structure, the project debt does not burden the financial statements of the initiators.

Assets are not used as collateral for debt, and the provider of capital (usually a large bank) issues a loan against future cash flows.

Before the 2020 pandemic, project financing was widely used for the construction of large tourist facilities, hotels, shopping and entertainment centers around the world. Many capital intensive projects in the French Riviera, Barcelona and other tourist destinations in Europe have been built using this mechanism.

But even today, when investors have redefined their attitude towards commercial real estate projects, there are ample opportunities for project finance in various areas.

Banks’ requirements for borrowers and development projects:

Before an investor goes to the bank with his project, he must answer a few questions.

First of all, does the project meet the basic requirements of the bank, necessary for the consideration of a loan application?

Below is a list of banks’ requirements for commercial real estate projects:

• Formal legal requirements. A reliable investment project must have an orderly legal status of real estate. In addition, banks pay attention to the presence or willingness of participants to create an SPV / SPE, the presence of building conditions or a building permit.

• Technical requirements of the bank. To finance the project, a positive assessment of the project and a conclusion on the technical feasibility of the project are required. The initial document confirming this possibility is an architectural project, and then a building permit. In addition, the experience of an investor in commercial real estate or the ability to provide expert services is important for most banks.

• Financial requirements. To negotiate with the bank, a potential borrower is required to provide a ready-made financial model with a business plan. Typically, the project initiator must provide 10 to 40% of the investment costs. The documentation must confirm compliance with the DSCR (Debt Service Coverage Ratio) standards.

• Marketing requirements. The Bank requires a positive result of market research, confirming the possibility of leasing retail space or selling real estate on favorable terms.

The choice of the financing bank should not be random.

Financing a construction investment project is a long process.

When deciding to cooperate with a bank, an investor should be aware that for several years he will have to interact with this lender and depend on him.

Ineffective collaboration can negatively impact project implementation. During the construction of real estate, the real estate project can change greatly, so the investor must not only assess the financial conditions, but also analyze the bank’s policy.

Alternative sources of financing for real estate projects

Bank financing of real estate projects remains the most popular and affordable type of funding for CRE  projects.

However, the pandemic and economic downturn are forcing banks to treat borrowers more selectively, and development companies have become cautious with lending funds.

The greatest difficulties in obtaining loans are experienced by hotel and commercial real estate. Banks are still open to finance investments in warehouses, offices and residential premises, but financing conditions are more conservative.

Funding for commercial real estate after 2020 is still limited to the best projects.

Moreover, todaylarge construction projectsare supported only by a few banks, and it is almost impossible to obtain credit funds for hotels.

Banks have also tightened their funding criteria and are now offering lower LTV and LTC options, expecting higher levels of pre-lease retail space and sales for residential properties.

There is also an increase in loan margins and a significant increase in the processing time for loan applications.

Experts point out that this could be an impetus for investors to search for alternative financing methods, the availability of which is still limited in many countries of the world. However, the current situation shows that dependence on one form and lack of diversification of sources of financing for commercial real estate is a critical issue that threatens the survival of the business.

Regardless of the choice of funding sources, companies need to properly prepare for real estate investments.

A business plan, project documentation and financial analysis are the minimum that can become a prologue to serious negotiations on financing real estate construction.

Another financial indicator that is important to consider is LTC (Loan to Cost). It indicates the ratio of the cost of the loan to the cost of building the property. Assessing this ratio can give project participants clear information about whether there is a chance of a return on investment.

Banks also often condition the decision to grant a loan on the value of the LTC ratio.

So, financing of real estate projects and the construction of  the facility through a long-term loan is still the most popular solution among investors.

Almost all institutions on the market offer loans for real estate construction. However, investors are frustrated by the increasingly restrictive approach of banks to assessing a potential borrower.

The pandemic that led to the economic downturn is making it difficult to finance some retail, hotel and sports facilities around the world.

Of course, this situation does not exclude the possibility of concluding a loan agreement, but the proposals of banks may be far from your expectations.